Home Cricket South Africa vs Bangladesh, 1st Take a look at, Day 4 Stay...

South Africa vs Bangladesh, 1st Take a look at, Day 4 Stay Rating Updates: South Africa Look To Prolong Lead | Cricket Information

0

SA vs Ban, 1st Take a look at Stay: South Africa will look to increase their lead towards Bangladesh on Day 4.© AFP

South Africa vs Bangladesh, 1st Take a look at, Day 4, Stay Rating Updates:South Africa ended Day 3 of the continued first Take a look at towards Bangladesh, having prolonged their result in 75 and now the hosts would hope for including runs in fast succession to maneuver the match alongside. Earlier, Mahmudul Hasan Pleasure performed a knock of 137 as Bangladesh posted 298 runs within the first innings. South Africa gained a slender lead of 69 runs. At stumps on Day 3, South Africa prolonged their result in 75 within the ongoing first Take a look at on the Kingsmead, Durban. Within the first innings, South Africa had posted 367 runs on the board, owing to a 93-run knock from Temba Bevuma. Then Simon Harmer acquired into the motion as he took 4 wickets and Bangladesh batters had no solutions to the pacer’s bowling. (Stay Scorecard)

Enjoying XIs

South Africa: Dean Elgar (c), Sarel Erwee, Keegan Petersen, Temba Bavuma, Ryan Rickelton, Kyle Verreynne (wk), Wiaan Mulder, Keshav Maharaj, Simon Harmer, Lizaad Williams, Duanne Olivier

Bangladesh:Shadman Islam, Mahmudul Hasan Pleasure, Mominul Haque (c), Najmul Hossain Shanto, Mushfiqur Rahim, Liton Das (wk), Yasir Ali, Mehidy Hasan, Taskin Ahmed, Khaled Ahmed, Ebadot Hossain

South Africa vs Bangladesh, 1st Take a look at, Day 4, Stay Rating Updates From Kingsmead In Durban

Subjects talked about on this article


Supply hyperlink

Previous article‘No excuses’ – Nationwide media react as Chelsea crushed by the hands of Brentford
Next articleBullets beat 36ers in gripping NBL battle

LEAVE A REPLY

Please enter your comment!
Please enter your name here